New level

  • New level
  • New level
  • New level
  • New level
  • New level
  • New level
  • New level
  • New level
  • New level

New level

Our construction does not stop even in winter!
Today:
– columns, armored belts and part of the ceiling of floors 2 and 3 are flooded;
– the basement was poured with concrete.
Thank you for supporting and participating in this project!

Share

Comments are closed.